Principal Power Generation Combustion Turbine Engineer
NextEra Energy - Location not specified
Posted Mar 19, 2026
Verified benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Verified
- No last checked 2026-05-07T13:50:00Z
- Salary
- Not disclosed
Where they hire
State eligibility is not yet verified.
About this role
Principal Power Generation Combustion Turbine Engineer Requisition ID: [[id]] Florida Power & Light Company is the largest electric utility in the U.S., providing reliable energy to nearly 12 million Floridians.
Read the full description at jobs.nexteraenergy.com. FewerJobs shows a source-linked preview and links to the original posting.
Related jobs
-
Wildland Firefighting Manager (Branch Chief - Fuels) - Direct Hire Authority
Department of the Interior - Boise, Idaho
-
Stars of Valor Fellow - Senator Ossoff - Washington, DC #443
Legislative Branch - Washington, District of Columbia
-
Supervisory Grants Management Specialist (Deputy Director)
Department of Agriculture - Location Negotiable After Selection
-
Vice President, Regional Director (Central)
Ares Management - 4 Locations