FewerJobs.
All jobs

Connectivity Engineer - Data Center Construction | Ingénieur en connectivité - Construction de centres de données

Meta - Vancouver, Canada

Posted Jun 7, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified checked Jun 7, 2026
Salary
$104K-$142K From the posting source checked Jun 20, 2026
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Market context

U.S. role benchmark (BLS OEWS)
$116,543 U.S. median for this role
Projected growth (BLS Employment Projections)
+9.8% - Much faster than average

U.S. benchmark only; posted salary is not compared across countries or currencies.

Matched to SOC 15-1252 - Software Engineering aggregate by role bucket.

Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.

Role

Role function
Engineering From the posting source checked Jun 20, 2026
Seniority
Mid From the posting source checked Jun 20, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Company

Company stage
Public-company From the posting source checked Jun 20, 2026
Equity
Offered Verified - SEC 10-K source checked Jun 20, 2026

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Connectivity Engineer - Data Center Construction | Ingénieur en connectivité - Construction de centres de données Vancouver, Canada Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta 's global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta 's server banks. The DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally. ------- Meta recherche un ingénieur en connectivité pour rejoindre l'équipe de conception, d'ingénierie et de construction (DEC). Nos centres de données constituent le socle sur lequel reposent nos services et notre infrastructure en pleine expansion. L'équipe assure le bon fonctionnement des centres de données mondiaux de Meta, en fournissant l'infrastructure physique qui relie le monde aux vidéos, aux flux et aux autres informations stockées sur les parcs de serveurs de Meta. L'ingénieur en connectivité de DEC fournira un soutien sur site afin de garantir que les projets de télécommunications de DEC soient exécutés

Read the full description at www.metacareers.com. FewerJobs shows a preview and links to the original posting.

Apply at metacareers.com

Apply link not verified; last-live date unavailable.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs