Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Port Washington, WI)
Oracle Corporation - WI, United States
Posted Oct 7, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified checked Nov 20, 2026
- Salary
- Not verified
- 401(k) match
- Reported from DOL Form 5500 industry filing (not employer-specific)
Was this benefit information wrong? Tell us.
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Company
- Equity
- Offered Verified - SEC 10-K source
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Port Washington, WI) WI, United States Oracle Cloud Infrastructure (OCI) is expanding its data center portfolio to support global cloud and AI infrastructure. The Physical Security Systems team works across design, construction, commissioning, and operations to deliver reliable security systems for these facilities. This Lead Principal Physical Security Systems Engineer serves as a senior technical authority for physical security systems on complex data center construction projects. The role works with design, construction, security operations, networking, commissioning, and vendor teams to ensure systems meet OCI standards and are ready for operational use. NOTE: This is a full-time role located onsite at our new hyperscale facility in Port Washington, Wisconsin. Relocation assistance will be provided.
Read the full description at eeho.fa.us2.oraclecloud.com. FewerJobs shows a preview and links to the original posting.
Apply link verified; last checked Nov 20, 2026.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Port Washington, WI)
Oracle - WI, United States, US
Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Saline Township, MI)
Oracle Corporation - MI, United States
Associate Physical Security Engineer, Data Center Design Engineering
Amazon - Seattle, Washington, USA
Principal Security Engineer
Microsoft - Redmond, WA, US, Mountain View, CA, US, Hillsboro, OR, US, Austin, TX, US, Raleigh, NC, US