FewerJobs.
All jobs

Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Port Washington, WI)

Oracle - WI, United States, US

Posted Oct 7, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Offered From the posting source checked Nov 16, 2026
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified checked Nov 20, 2026
Salary
$135K-$306K From the posting source checked Nov 16, 2026
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Role

Role function
Security From the posting source checked Nov 16, 2026
Seniority
Principal From the posting source checked Nov 16, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Company

Equity
Offered Verified - SEC 10-K source checked Nov 16, 2026

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Port Washington, WI) WI, United States, US Oracle Cloud Infrastructure (OCI) is expanding its data center portfolio to support global cloud and AI infrastructure. The Physical Security Systems team works across design, construction, commissioning, and operations to deliver reliable security systems for these facilities. This Lead Principal Physical Security Systems Engineer serves as a senior technical authority for physical security systems on complex data center construction projects. The role works with design, construction, security operations, networking, commissioning, and vendor teams to ensure systems meet OCI standards and are ready for operational use. NOTE: This is a full-time role located onsite at our new hyperscale facility in Port Washington, Wisconsin. Relocation assistance will be provided. Required Qualifications • Significant experience designing, delivering, or managing physical security systems in data centers, mission-critical facilities, large campuses, or similarly secure environments. • Strong knowledge of access control, video surveillance, intrusion detection, intercoms, perimeter security, and security monitoring platforms. • Experience reviewing construction drawings, specifications, submittals, device schedules, and commissioning documentation. • Understanding of low-voltage construction, structured cabling, device installation, labeling, testing, and system integration. • Proven ability to manage integrators, contractors, and vendors while coordinating with cross-functional teams. • Ability to identify technical, quality, and schedule risks and communicate clearly with field teams and leadership. • Experience reviewing vendor scope, change orders, pricing, and schedule impacts. • Bachelor's degree in engineering, construction management, information technology, security management, or a related field, or equivalent practical experience.

Read the full description at careers.oracle.com. FewerJobs shows a preview and links to the original posting.

Apply at careers.oracle.com

Apply link verified; last checked Nov 20, 2026.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs