Data Center Construction Turnover Lead
Oracle - MI, United States, US
Posted Jun 4, 2026
Benefits
- Parental leave
- 14 weeks From the posting source checked Jun 20, 2026
- Non-birth-parent leave
- 14 weeks From the posting source checked Jun 20, 2026
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Offered From the posting source checked Jun 20, 2026
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Source-linked checked May 7, 2026
- Salary
- $98K-$200K From the posting source checked Jun 20, 2026
- 401(k) match
- Reported from DOL Form 5500 industry filing (not employer-specific)
Was this benefit information wrong? Tell us.
Market context
- U.S. role benchmark (BLS OEWS)
- $111,944 U.S. median for this role
- Projected growth (BLS Employment Projections)
- +13.7% - Much faster than average
33% above the BLS role benchmark for data and ml aggregate.
Matched to SOC 15-1252 - Data and ML aggregate by role bucket.
Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.
Role
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Company
- Equity
- Offered Verified - SEC 10-K source checked Jun 20, 2026
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Data Center Construction Turnover Lead MI, United States, US The Construction Turnover Lead, part of the data center construction team, is responsible for orchestrating the phased, secure, and on-time turnover of new data center capacity from construction to operations. Serving as the primary liaison among the developer, their general contractor, vendors, and Oracle's operations team, this role ensures all turnover deliverables-including as-builts, commissioning and test records, compliance certifications, and O&M manuals-are accurate, comprehensive, and delivered per schedule. The Construction Turnover Lead also verifies that all Method of Procedure (MOP) documents, standard operating procedures, and emergency procedures are developed and reviewed for adequacy. This role coordinates vendor-led training for site operations, manages punchlist and deficiency closeout, and facilitates clear communication and documentation throughout the turnover process. By maintaining rigorous standards, the Construction Turnover Lead ensures each increment of data center capacity is safe, secure, fully documented, and ready for smooth operational integration. Key Responsibilities Turnover & Operational Readiness Coordinate the phased turnover of data center capacity from construction to operations, ensuring safety, security, and readiness at each stage. Ensure all required documentation (as-builts, O&M manuals, MOPs, test records) is complete, accurate, and delivered on time. Schedule and facilitate vendor-led training for operations teams to support a smooth site handoff. Quality, Integration & Commissioning Support Oversee quality control processes, site walks, and audits with the developer/GC to confirm work meets Oracle standards and operational requirements. Align and track status of punchlist closure, commissioning outcomes, and milestone acceptances to OCI operational needs. Coordinate
Read the full description at careers.oracle.com. FewerJobs shows a preview and links to the original posting.
Apply link not verified; last-live date unavailable.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
-
Head of Client Data Strategy
NB Bancorp INC - New York, NY
-
Data Analytics Engineer
AXOS Financial INC - HQ - San Diego, CA
-
IT Oracle Manager
Arrow Financial CORP - US-CO-Denver, Colorado (Panorama Arrow Building)
-
Executive Director, Enterprise Data Management
Alkermes - Waltham, MA, United States