Connectivity Engineer, Leased - Data Center Construction
Meta - Remote, US
Posted May 3, 2026
Verified benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Verified
- No last checked 2026-05-07T13:50:00Z
- Salary
- $123K-$176K
- 401(k) match
- Not verified
Market context
- Median wage (BLS OEWS)
- $61,842 national median
- Projected growth (BLS Employment Projections)
- +1.9% - Slower
142% above the BLS national median for operations aggregate.
Matched to SOC 11-1021 - Operations aggregate by role bucket.
Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.
Where they hire
State eligibility is not yet verified.
About this role
Connectivity Engineer, Leased - Data Center Construction Remote, US Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation
Read the full description at www.metacareers.com. FewerJobs shows a source-linked preview and links to the original posting.
Related jobs
-
Quality Engineer
Tetra Pak - Location not specified
-
Occupational Health & Safety Adviser
Tetra Pak - Location not specified
-
Project Coordinator
Tetra Pak - Location not specified
-
Courtroom Deputy I
Judicial Branch - Saint Croix, Virgin Islands