FewerJobs.
All jobs

Project Scheduler (Temporary)

Legislative Branch - Washington, District of Columbia

Posted Jun 5, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified
Salary
$122K-$158K From the posting source checked Jun 20, 2026
401(k) match
Not verified

Was this benefit information wrong? Tell us.

Market context

U.S. role benchmark (BLS OEWS)
$61,842 U.S. median for this role
Projected growth (BLS Employment Projections)
+1.9% - Slower

126% above the BLS role benchmark for operations aggregate.

Matched to SOC 11-1021 - Operations aggregate by role bucket.

Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.

Role

Role function
Operations From the posting source checked Jun 20, 2026
Seniority
Mid From the posting source checked Jun 20, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Application

Cover letter
Not verified
Assessment
Required From the posting source checked Jun 20, 2026
Deadline
Not stated

Where they hire

Hires in: DC From the posting source checked Jun 20, 2026

About this role

Project Scheduler (Temporary) Washington, District of Columbia Summary This position is located in the Architect of the Capitol, Office of the Chief Engineer. The selectee will be responsible for developing, reviewing, monitoring and analyzing planning, design and construction schedules on a broad range of building projects during programming, planning, design and construction phases. Duties The individual selected for this position will perform the following: Construction Project Scheduling, Oversight and/or Coordination Coordinates and integrates the planning, programming, development, oversight, scheduling and overall management of resources for multi-phase projects. Consults with project personnel to help ensure a progress schedule is maintained and takes remedial action to ensure the proper relationship between work efforts and schedule compliance. Reviews resources estimates to ensure proper distribution of project resources. Keeps abreast of changes and cost variations from design through construction and installation to ensure completion on time and within the designated budget. Resolves difficult project control issues. Performs additional data systems and analysis work. Reviews cost loaded Critical Path Method (CPM) schedule updates for invoice amounts and ensures contract costs are precisely accounted for. Maintains all construction updates in the Primavera database for archival purposes and forensic analysis. Multi-phase Projects Analyzes and defines the requirements of multi-phase projects. Participates in the development of requirements with project managers, analyzes requirements and design criteria, reviews cost estimates, ensures validation of requirements and evaluates schedules and the feasibility of project accomplishment. Determines specification practicability for complex or costly construction projects. As a construction technical representative, performs construction management

Read the full description at www.usajobs.gov. FewerJobs shows a preview and links to the original posting.

Apply at usajobs.gov

Apply link not verified; last-live date unavailable.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs