FewerJobs.
All jobs

Toll Systems Analyst

Ferrovial - Dallas

Posted Nov 18, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified
Salary
Not verified
401(k) match
Not verified

Was this benefit information wrong? Tell us.

Role

Seniority
Mid From the posting source

Schedule

Shift type
Not verified
Weekend work
Not verified

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Toll Systems Analyst Dallas Who is NTE, NTE 35W, and LBJ? The North Tarrant Express (NTE) was the first design-build-finance-operate-maintain managed lanes project in Texas and consisted of the complete reconstruction of 13.3 miles of the existing I-820/SH-183 corridor between Dallas and Fort Worth. Since opening in October 2014, nine months ahead of the contracted completion date, the general highway lanes are experiencing a 70% decrease in congestion time and a 15% increase in average speed. This Cintra-led project has doubled capacity and significantly improved mobility along this heavily congested corridor that traverses the heart of six cities through Northeast Tarrant County. The North Tarrant Express 35W (NTE 35W) project spans 16.8 miles from I-30 in downtown Fort Worth to Eagle Parkway at the north end of Alliance Airport. The project is operated and maintained by the Cintra-led consortium in North Texas. This project has improved mobility by adding additional road capacity through a combination of general highway lanes and continuous frontage roads, along with tolled express lanes that use variable pricing to keep traffic moving. The LBJ Express (LBJ) is currently the largest P3 operation in Texas and one of the largest ever undertaken in the U.S. It is a regionally-significant transportation improvement project in North Texas that is relieving severe congestion in the dense urban area of north Dallas. In 2009, the Cintra-led consortium was selected to complete the design, construction, finance, operation, and maintenance of the project along I-635 and I-35E. Since opening in September 2015, the

Read the full description at ferrovial.wd3.myworkdayjobs.com. FewerJobs shows a preview and links to the original posting.

Apply at ferrovial.wd3.myworkdayjobs.com

Apply link verified; last checked Nov 20, 2026.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs