Aerospace Program Manager (Product Development, Earned Value Mgmt.)
Danaher Corporation - New Port Richey, Florida, United States of America
Posted May 27, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified checked Jun 13, 2026
- Salary
- Not verified
- 401(k) match
- Reported from DOL Form 5500 industry filing (not employer-specific)
Was this benefit information wrong? Tell us.
Market context
- U.S. role benchmark (BLS OEWS)
- $116,543 U.S. median for this role
- Projected growth (BLS Employment Projections)
- +9.8% - Much faster than average
Matched to SOC 15-1252 - Software Engineering aggregate by role bucket.
Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.
Role
- Role function
- Engineering From the posting source
- Seniority
- Senior Inferred - source not recorded
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Company
- Equity
- Offered Verified - SEC 10-K source
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Aerospace Program Manager (Product Development, Earned Value Mgmt.) New Port Richey, Florida, United States of America Embrace the opportunity to become an Aerospace Program Manager and lead complex product development projects in the life sciences and biotechnology sector. Drive cross-functional teams, manage budgets and timelines, and deliver innovative aerospace solutions. Shape the future of aerospace with a global leader committed to innovation and impactful results.
Read the full description at danaher.wd1.myworkdayjobs.com. FewerJobs shows a preview and links to the original posting.
Apply link not verified; last-live date unavailable.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
-
Hardware System and Board Failure Analysis Technical Lead
Cisco - Milpitas, California, US
-
Senior Software Engineer, Simulation and Integration
Axcelis Technologies INC - Beverly, MA
-
Payload AI&T Lead Staff Systems Engineer
Northrop Grumman - United States-Maryland-Linthicum
-
Senior Software Engineer, Equipment Control
Axcelis Technologies INC - Beverly, MA