FewerJobs.
All jobs

Chief of Party, Jordan - Building Water Infrastructure

CDM Smith - Location not specified

Posted Jun 10, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified checked Jun 7, 2026
Salary
Not verified
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Role

Role function
Security From the posting source checked Jun 20, 2026
Seniority
Senior From the posting source checked Jun 20, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Chief of Party, Jordan - Building Water Infrastructure Project Description The Building Water Infrastructure (BWI) Program in Jordan is a multi‑year initiative funded by the United States Government (USG) designed to strengthen Jordan's water security through planning, design, construction supervision, and institutional capacity building for priority water and wastewater infrastructure investments. The program supports the Government of Jordan (GOJ) in improving water availability, efficiency, resilience, and sustainability by delivering high‑quality engineering services and reinforcing the technical and managerial capacity of national water sector institutions. Activities typically include infrastructure assessments, feasibility studies, detailed design, tender support, construction supervision, independent quality assurance, and targeted capacity development for key sector entities such as the Ministry of Water and Irrigation, the Water Authority of Jordan, and water utilities. BWI is currently implementing 20 work assignments with separate budgets and schedules for a range of technical and engineering work on 34 projects across all governorates in Jordan, consisting of four strategic national projects,ten wastewater treatment plants (WWTPs), three water treatment plants (WTPs), and six water supply and distribution system projects. Assignment Location: Amman, Jordan Assignment Duration: Minimum 2 years, with option to extend Position Description The Chief of Party (CoP) is the senior-most project representative and has overall responsibility for the technical, managerial, and administrative leadership of the BWI program in Jordan. The CoP serves as the primary point of contact with the USG, the Government of Jordan, and key sector stakeholders, ensuring that program objectives are achieved in accordance with contract requirements, approved work

Read the full description at sjobs.brassring.com. FewerJobs shows a preview and links to the original posting.

Apply at sjobs.brassring.com

Apply link not verified; last-live date unavailable.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs