Chief of Party, Jordan - Building Water Infrastructure
CDM Smith - Location not specified
Posted Jun 10, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified checked Jun 7, 2026
- Salary
- Not verified
- 401(k) match
- Reported from DOL Form 5500 industry filing (not employer-specific)
Was this benefit information wrong? Tell us.
Role
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Chief of Party, Jordan - Building Water Infrastructure Project Description The Building Water Infrastructure (BWI) Program in Jordan is a multi‑year initiative funded by the United States Government (USG) designed to strengthen Jordan's water security through planning, design, construction supervision, and institutional capacity building for priority water and wastewater infrastructure investments. The program supports the Government of Jordan (GOJ) in improving water availability, efficiency, resilience, and sustainability by delivering high‑quality engineering services and reinforcing the technical and managerial capacity of national water sector institutions. Activities typically include infrastructure assessments, feasibility studies, detailed design, tender support, construction supervision, independent quality assurance, and targeted capacity development for key sector entities such as the Ministry of Water and Irrigation, the Water Authority of Jordan, and water utilities. BWI is currently implementing 20 work assignments with separate budgets and schedules for a range of technical and engineering work on 34 projects across all governorates in Jordan, consisting of four strategic national projects,ten wastewater treatment plants (WWTPs), three water treatment plants (WTPs), and six water supply and distribution system projects. Assignment Location: Amman, Jordan Assignment Duration: Minimum 2 years, with option to extend Position Description The Chief of Party (CoP) is the senior-most project representative and has overall responsibility for the technical, managerial, and administrative leadership of the BWI program in Jordan. The CoP serves as the primary point of contact with the USG, the Government of Jordan, and key sector stakeholders, ensuring that program objectives are achieved in accordance with contract requirements, approved work
Read the full description at sjobs.brassring.com. FewerJobs shows a preview and links to the original posting.
Apply link not verified; last-live date unavailable.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
-
Principal Structural Engineer - Hydropower
Jacobs Solutions - Location not specified
-
Vessel Chief Engineer
Oceaneering International INC - Morgan City, LA, United States
-
Senior Water Resources Engineer
Onterris INC - 3 Locations
-
Chief EngineerI
Vishay Precision Group INC - Tianjin, CN