Site Lead - Datacenter Construction, Thermal & AC Power - El Paso
Vertiv - El Paso, TX, United States
Posted Oct 14, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified
- Salary
- Not verified
- 401(k) match
- Not verified
Was this benefit information wrong? Tell us.
Role
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Company
- Equity
- Offered Verified - SEC 10-K source
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Site Lead - Datacenter Construction, Thermal & AC Power - El Paso El Paso, TX, United States The Site Leader will provide world class jobsite leadership for large, long-duration, high-profile projects for Vertiv power and/or thermal equipment. The Site Leader is the primary Vertiv Service on-site technical representative for large jobs, from construction start, through start-up, site acceptance testing, and project completion. The Site Leader is required to establish, grow and maintain excellent rapport with all customers, co-workers, sales representatives and others as appropriate. The Site Lead is required to work in tandem with the assigned Project Manager to drive cost controls, schedule adherence, resource management, and ultimately a positive customer experience.
Read the full description at egup.fa.us2.oraclecloud.com. FewerJobs shows a preview and links to the original posting.
Apply link verified; last checked Nov 20, 2026.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
Datacenter Site Leader + Thermal + AC Power - El Paso TX
Vertiv - El Paso, TX, United States
Transformer Team Leader
GE Vernova - Houston
Content Lead
Base Power - Austin, TX, Austin, Texas, United States
Team Lead- Coater USA (Crew D/ PM Shift)
First Solar - New Iberia, LA, United States