Data Center Construction Lead - Cooling Systems
Trane Technologies plc - Milwaukee, Wisconsin
Posted May 12, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified checked Jun 13, 2026
- Salary
- Not verified
- 401(k) match
- Reported from DOL Form 5500 industry filing (not employer-specific)
Was this benefit information wrong? Tell us.
Market context
- U.S. role benchmark (BLS OEWS)
- $111,944 U.S. median for this role
- Projected growth (BLS Employment Projections)
- +13.7% - Much faster than average
Matched to SOC 15-1252 - Data and ML aggregate by role bucket.
Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Company
- Equity
- Offered Verified - SEC 10-K source
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Data Center Construction Lead - Cooling Systems Milwaukee, Wisconsin posted: Posted 30+ Days Ago
Read the full description at tranetechnologies.wd12.myworkdayjobs.com. FewerJobs shows a preview and links to the original posting.
Apply link not verified; last-live date unavailable.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
-
Vice President of Development - Data Center Power Infrastructure
Ameresco INC - United States - Texas - Remote
-
Director, Data Products and Engineering
Starz Entertainment CORP - Denver, CO (Greenwood Village)
-
Senior Data Engineer- MSI
Baldwin Insurance Group INC Class - Remote US
-
Head of Client Data Strategy
NB Bancorp INC - New York, NY