FewerJobs.
All jobs

Vessel Scheduler

Saronic - Franklin, LA, Franklin, Louisiana, United States

Posted Oct 13, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified
Salary
Not verified
401(k) match
Reported not verified - source not recorded; source URL not recorded; timestamp not recorded

Was this benefit information wrong? Tell us.

Market context

U.S. role benchmark (BLS OEWS)
$61,842 U.S. median for this role
Projected growth (BLS Employment Projections)
+1.9% - Slower

Matched to SOC 11-1021 - Operations aggregate by role bucket.

Source:U.S. Bureau of Labor Statistics, OEWS, May 2024andEmployment Projections, 2024-2034.

Role

Role function
Operations From the posting source checked Nov 19, 2026
Seniority
Mid From the posting source checked Nov 19, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Company

Equity
Offered From the posting source checked Nov 19, 2026

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Vessel Scheduler Franklin, LA, Franklin, Louisiana, United States Saronic Technologies is a leader in revolutionizing autonomy at sea, dedicated to developing state-of-the-art solutions that enhance maritime operations through autonomous and intelligent platforms. Job Overview The Vessel Planner owns the detailed production schedule for one or more assigned hulls and is responsible for maintaining activity logic, production sequencing, progress updates, near-term priorities, and forecasted vessel milestones in Primavera P6. The Vessel Planner works closely with shop and production leadership to keep the hull schedule accurate and executable, and ensures that each detailed hull schedule directly supports the integrated master schedule so that milestone changes at the hull level are reflected in the overall site forecast. Responsibilities - Develop and maintain the detailed Primavera P6 schedule for each assigned vessel, including activity logic, durations, and production sequencing. - Verify work breakdown structure (WBS), estimates, durations, and sequence logic for accuracy and constructibility at the hull level. - Status the schedule with timely progress updates and keep near-term priorities and look-ahead schedules current. - Maintain forecasted vessel milestones and ensure hull-level changes roll up into the integrated master schedule. - Preserve schedule integrity through ongoing logic review, resolving open-ended activities, constraints, and out-of-sequence work. - Perform critical path and near-critical path analysis at the hull level to identify risks and recovery opportunities. - Calculate schedule variance (SV) and Schedule Performance Index (SPI) against baseline. - Produce milestone bar chart schedules, S-curves, and look-ahead schedules (for example, 3-week and 90-day). - Prepare progress updates

Read the full description at jobs.ashbyhq.com. FewerJobs shows a preview and links to the original posting.

Apply at jobs.ashbyhq.com

Apply link verified; last checked Nov 20, 2026.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs