License Renewal Engineering Consultant 2 - Nuclear
Sargent & Lundy - Chicago, IL, US
Posted Nov 18, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified checked Nov 20, 2026
- Salary
- $145K-$222K From the posting source
- 401(k) match
- Reported from DOL Form 5500 industry filing (not employer-specific)
Was this benefit information wrong? Tell us.
Market context
- U.S. role benchmark (BLS OEWS)
- $116,543 U.S. median for this role
- Projected growth (BLS Employment Projections)
- +9.8% - Much faster than average
58% above the BLS role benchmark for software engineering aggregate.
Matched to SOC 15-1252 - Software Engineering aggregate by role bucket.
Source:U.S. Bureau of Labor Statistics, OEWS, May 2024andEmployment Projections, 2024-2034.
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
License Renewal Engineering Consultant 2 - Nuclear Chicago, IL, US Responsibilities We are seeking an experienced License Renewal (LR) and Subsequent License Renewal (SLR) engineer in the nuclear industry. We support various nuclear power plants' license extensions and post license approval implementation activities across the US nuclear power plant fleet. The ideal candidate would have experience with LR/SLR application or implementation activities, nuclear industry related engineering programs, nuclear power plant work management/scheduling, NRC submittals, and/or NRC inspections. Example LR/SLR application activities include scoping, screening, aging management reviews, aging management programs, Time Limited Aging Analysis (TLAAs), Further Evaluations, operating experience review, and modification history review as described in NEI 95-10 and NEI 17-01. Example LR/SLR implementation activities include procedure changes, preventative maintenance basis and frequency development, work order development and review, online and outage work management and scheduling, nuclear program basis document development, NRC commitment closure, NRC Inspection Procedure 71003 experience. Preferred candidates would have experience in one or more of the following disciplines and/or Aging Management programs. Mechanical Aging Management Programs ASME Section XI Inservice Inspection Water Chemistry Reactor Head Closure Studs Boiling Water Reactor (BWR) Inner Diameter Attachment Welds BWR Stress Corrosion Cracking BWR Penetrations BWR Vessel Internals Boric Acid Corrosion Cracking of Nickel Alloy Components and Loss of Material due to Boric Acid Induced Corrosion in Reactor Coolant Pressure Boundary Components Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) PWR Vessel Internals Flow-Accelerated Corrosion Bolting Integrity Steam Generators Open-Cycle Cooling Water System Closed Treaded Water Systems Boraflex
Read the full description at careers-sargentlundy.icims.com. FewerJobs shows a preview and links to the original posting.
Apply link verified; last checked Nov 20, 2026.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
Senior License Renewal Engineer 1 - Nuclear
Sargent & Lundy - Chicago, IL, US
Licensing Engineer
Amentum - US-TN-Oak Ridge
Nuclear Engineer II - Civil / Structural
NextEra Energy - Palo, IA, US
Senior Licensing Engineer
Standard Nuclear - Oak Ridge, TN