FewerJobs.
All jobs

Electrical Engineering Associate, Energy Storage

Redwood Materials - Carson City, NV

Posted Oct 14, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified
Salary
Not verified
401(k) match
Not verified

Was this benefit information wrong? Tell us.

Market context

U.S. role benchmark (BLS OEWS)
$116,543 U.S. median for this role
Projected growth (BLS Employment Projections)
+9.8% - Much faster than average

Matched to SOC 15-1252 - Software Engineering aggregate by role bucket.

Source:U.S. Bureau of Labor Statistics, OEWS, May 2024andEmployment Projections, 2024-2034.

Role

Role function
Engineering From the posting source checked Nov 16, 2026
Seniority
Mid From the posting source checked Nov 16, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Electrical Engineering Associate, Energy Storage Carson City, NV About Redwood Materials Redwood Materials was founded in 2017 by JB Straubel, co-founder and former CTO of Tesla, on a simple but radical idea: the critical minerals powering the energy transition already exist. They just need to come back. Today Redwood is the largest lithium-ion battery recycler in North America - recovering, refining, and redeploying critical minerals from end-of-life batteries back into the supply chain. On the energy side, Redwood has deployed the largest second-life battery project in the world, delivering power to AI data centers in months rather than years using proprietary energy architecture engineered entirely in-house. The company is profitable, the market it operates in is projected to grow 20 to 50 times over the next decade, and Redwood is the only company with the supply chain, the technology, and the operational scale to lead it. Position Summary: The Electrical Engineering Associate, Energy Storage supports Redwood's next-generation Battery Energy Storage System (BESS) program by performing hands-on technical tasks. This is a fully on-site role at 2800 Lockheed Way, Carson City. You will perform a broad variety of hands-on technical tasks in support of Redwood's next-generation Battery Energy Storage System (BESS). In this role, you will primarily work with engineers to create sophisticated printed circuit board (PCB) designs using software tools and use your technical abilities to build, test, and fix PCB prototypes. Additional responsibilities include management of an electronics laboratory, installing and running tests on power equipment in the field,

Read the full description at boards.greenhouse.io. FewerJobs shows a preview and links to the original posting.

Apply at boards.greenhouse.io

Apply link verified; last checked Nov 20, 2026.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs