Electrical Engineering Associate, Energy Storage
Redwood Materials - Carson City, NV
Posted Oct 14, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified
- Salary
- Not verified
- 401(k) match
- Not verified
Was this benefit information wrong? Tell us.
Market context
- U.S. role benchmark (BLS OEWS)
- $116,543 U.S. median for this role
- Projected growth (BLS Employment Projections)
- +9.8% - Much faster than average
Matched to SOC 15-1252 - Software Engineering aggregate by role bucket.
Source:U.S. Bureau of Labor Statistics, OEWS, May 2024andEmployment Projections, 2024-2034.
Role
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Electrical Engineering Associate, Energy Storage Carson City, NV About Redwood Materials Redwood Materials was founded in 2017 by JB Straubel, co-founder and former CTO of Tesla, on a simple but radical idea: the critical minerals powering the energy transition already exist. They just need to come back. Today Redwood is the largest lithium-ion battery recycler in North America - recovering, refining, and redeploying critical minerals from end-of-life batteries back into the supply chain. On the energy side, Redwood has deployed the largest second-life battery project in the world, delivering power to AI data centers in months rather than years using proprietary energy architecture engineered entirely in-house. The company is profitable, the market it operates in is projected to grow 20 to 50 times over the next decade, and Redwood is the only company with the supply chain, the technology, and the operational scale to lead it. Position Summary: The Electrical Engineering Associate, Energy Storage supports Redwood's next-generation Battery Energy Storage System (BESS) program by performing hands-on technical tasks. This is a fully on-site role at 2800 Lockheed Way, Carson City. You will perform a broad variety of hands-on technical tasks in support of Redwood's next-generation Battery Energy Storage System (BESS). In this role, you will primarily work with engineers to create sophisticated printed circuit board (PCB) designs using software tools and use your technical abilities to build, test, and fix PCB prototypes. Additional responsibilities include management of an electronics laboratory, installing and running tests on power equipment in the field,
Read the full description at boards.greenhouse.io. FewerJobs shows a preview and links to the original posting.
Apply link verified; last checked Nov 20, 2026.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
Senior Electrical Engineer, Energy Storage
Redwood Materials - Carson City, NV; San Francisco, California, United States
Electrical Engineer, Rack Power Distribution
General Matter - Los Angeles, CA
Lead Energy Storage Engineer
Nexamp - Chicago, IL
Electrical Engineer
Applied Materials - Santa Clara,CA