FewerJobs.
All jobs

Senior Planner

Onto Innovation - Wilmington-MA (Jonspin)

Posted Nov 4, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified checked Nov 20, 2026
Salary
$82K-$124K From the posting source checked Nov 18, 2026
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Market context

U.S. role benchmark (BLS OEWS)
$61,842 U.S. median for this role
Projected growth (BLS Employment Projections)
+1.9% - Slower

U.S. benchmark only; posted salary is not compared across countries or currencies.

Matched to SOC 11-1021 - Operations aggregate by role bucket.

Source:U.S. Bureau of Labor Statistics, OEWS, May 2024andEmployment Projections, 2024-2034.

Role

Role function
Operations From the posting source checked Nov 18, 2026
Seniority
Senior From the posting source checked Nov 18, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Company

Equity
Offered Verified - SEC 10-K source checked Nov 18, 2026

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Senior Planner Wilmington-MA (Jonspin) Onto Innovation is a leader in process control, combining global scale with an expanded portfolio of leading-edge technologies that include: 3D metrology spanning the chip from nanometer-scale transistors to micron-level die-interconnects; macro defect inspection of wafers and packages; metal interconnect composition; factory analytics; and lithography for advanced semiconductor packaging. Our breadth of offerings across the entire semiconductor value chain helps our customers solve their most difficult yield, device performance, quality, and reliability issues. Onto Innovation strives to optimize customers' critical path of progress by making them smarter, faster and more efficient. Job Summary & Responsibilities Works with other planners to co-ordinate the allocation of materials and plan for future periods as well as to review the current plan. Implements the decisions made by the team by modeling them in the Subassembly Production Schedule, and then manages the entire build from start to finish. Coordinates closely and continually with other planners to update the schedule in accordance with changes to the forecast, changes to tool configurations, inventory, and labor availability, etc. Incorporates ECN changes into existing work orders. Rework orders up to new rev per ECN time release. Communicates production plan changes and potential work stoppage issues. Proactively initiates solutions to scheduling, materials, and manufacturing challenges. Notifies purchasing staff when shortages need to be expedited. Provide input on to the Master Scheduler on item master settings such as Lead-time, Period of supply, Safety stock Generates, communicates, utilizes key performance data relating to schedule commit dates, activity levels,

Read the full description at onto.wd1.myworkdayjobs.com. FewerJobs shows a preview and links to the original posting.

Apply at onto.wd1.myworkdayjobs.com

Apply link verified; last checked Nov 20, 2026.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs