FewerJobs.
All jobs

Director of Semiconductor Technology

Helion Energy - Everett, WA | OnSite

Posted Oct 23, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified checked Nov 20, 2026
Salary
Not verified
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Role

Seniority
Director Plus From the posting source checked Nov 18, 2026
Work mode
Onsite From the posting source checked Nov 18, 2026
In-office days
5 days From the posting source checked Nov 18, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Director of Semiconductor Technology Everett, WA | OnSite About Helion We are a fusion power company based in Everett, WA, with the mission to build the world's first fusion power plant, enabling a future with unlimited clean electricity. Our vision is a world with clean, reliable, and affordable energy for everyone. Since Helion's founding in 2013, we have raised $1.5 billion from long-time investors such as Sam Altman, Mithril, and Capricorn Investment Group as well as new investors including Thrive Capital, LightSpeed Venture Capital, SoftBank, and others to propel us forward. Our current prototype, Polaris, has reached record-breaking plasma temperatures of 150 million degrees Celsius (13 keV). Helion is continuing to iterate and on the path to the world's first fusion power plant, Orion. This is a pivotal time to join Helion. You will tackle real-world challenges with a team that prizes urgency, rigor, ownership, and a commitment to delivering hard truths - values essential to achieving what no one has before. Together, we will change the future of energy, because the world can't wait. Why This Role Matters Every Helion fusion pulse runs current through semiconductor switches operated well beyond commercial ratings. Our next generation of fusion machines requires devices designed for our circuits rather than adapted to them, gated devices integrated as multi-die modules, and packaging that survives repetitive high-energy pulsing for power plant-scale lifetimes. You will lead the team that delivers these, from device physics through a development-scale fabrication capability to pilot module assembly and test, and

Read the full description at jobs.ashbyhq.com. FewerJobs shows a preview and links to the original posting.

Apply at jobs.ashbyhq.com

Apply link verified; last checked Nov 20, 2026.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs