FewerJobs.
All jobs

Technical Program Manager, Data Center Construction and Design Engineering

Google - Sunnyvale, CA, USA; +5 more

Posted Jun 10, 2026

Benefits

Parental leave
18 weeks From the posting source checked Jun 20, 2026
Non-birth-parent leave
18 weeks From the posting source checked Jun 20, 2026
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Source-linked checked May 7, 2026
Salary
$163K-$237K From the posting source checked Jun 20, 2026
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Market context

U.S. role benchmark (BLS OEWS)
$61,842 U.S. median for this role
Projected growth (BLS Employment Projections)
+1.9% - Slower

223% above the BLS role benchmark for operations aggregate.

Posted salary is far from this role benchmark; treat it as low confidence.

Matched to SOC 11-1021 - Operations aggregate by role bucket.

Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.

Role

Role function
Operations From the posting source checked Jun 20, 2026
Seniority
Mid From the posting source checked Jun 20, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Company

Equity
Offered Verified - SEC 10-K source checked Jun 20, 2026

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Technical Program Manager, Data Center Construction and Design Engineering Sunnyvale, CA, USA; +5 more A problem isn't truly solved until it's solved for all. That's why Googlers build products that help create opportunities for everyone, whether down the street or across the globe. As a Technical Program Manager at Google, you'll use your technical expertise to lead complex, multi-disciplinary projects from start to finish. You'll work with stakeholders to plan requirements, identify risks, manage project schedules, and communicate clearly with cross-functional partners across the company. You're equally comfortable explaining your team's analyses and recommendations to executives as you are discussing the technical tradeoffs in product development with engineers. The Technical Program Manager (TPM) for Sustaining Engineering Full Production Infrastructure Products occupies a critical intersection between Sustaining Engineering and Product Management. In this role, you will hold ownership of full production products, managing their entire lifecycle from Full Production through End of Life. You will provide expert technical project management for data center engineering execution, covering disciplines including civil, structural, mechanical, architectural, electrical, telecom, and fire protection. Beyond routine oversight, you will drive strategic initiatives to deliver new data center capacity at scale. Your work is vital in supporting post-facility-ready projects designed to extend the operational life of the existing data center fleet, with a particular emphasis on maintaining rigorous product documentation and strengthening key vendor relationships. Behind everything our users see online is the architecture built by the Technical Infrastructure team to keep it running. From developing and maintaining our

Read the full description at www.google.com. FewerJobs shows a preview and links to the original posting.

Apply at google.com

Apply link not verified; last-live date unavailable.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs