Lead Engineer - Aero Gas Turbine
GE Vernova - Houston
Posted Nov 12, 2026
Benefits
- Parental leave
- 10 weeks From the posting source checked Nov 17, 2026
- Non-birth-parent leave
- 10 weeks From the posting source checked Nov 17, 2026
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Offered From the posting source checked Nov 17, 2026
- Surrogacy assistance: Not verified
- Mental health support
- Offered From the posting source checked Nov 17, 2026
- Relocation assistance
- Offered From the posting source checked Nov 17, 2026
- Childcare support
- Not verified
- Learning budget
- Offered From the posting source checked Nov 17, 2026
- Verification
- Source-linked checked May 7, 2026
- Salary
- $98K-$164K From the posting source checked Nov 17, 2026
- 401(k) match
- Reported from DOL Form 5500 industry filing (not employer-specific)
Was this benefit information wrong? Tell us.
Role
- Seniority
- Senior From the posting source checked Nov 17, 2026
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Company
- Equity
- Offered Verified - SEC 10-K source checked Nov 17, 2026
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Lead Engineer - Aero Gas Turbine Houston Job Description Summary The Aero Gas Turbine Engineer will be responsible to support all the technical activities inside the Jport LM Service Shop, for the engines that will be assigned to him/her. He/she will manage also special tools design and industrialization. Jport LM Service Shop is a provider of overhaul services on LM Aero-derivative gas turbines: LM2500 (derived from GE aero engines CF6-6 and CF6-50), LM6000 (derived from CF6-80/C2 and CF6-80/E1) and LM9000 (derived from GE90-115B). The Aero Gas Turbine Engineer will report to the Engineering Manager - Gate 0 leader. Job Description Roles and Responsibilities Support New Technologies Introduction Support New Product Introduction on new engines overhaul Act as a focal point between DT and Operations organizations to develop new way of work and new tools Creation of engine specific works copes Create all the shop routers to make shop operations ready for engine induction Lead incoming inspection at engine induction Review of engine disassembly, answering to Shop operators technical questions Inspect and define the status of each part: Clean & inspect/ Ship to repair/ Scrap. Based on parts status, define extra-works that are needed from a technical standpoint Create the “Visual Inspection Report” to be discussed with Customers in order to show the status of the engine after disassembly and agree on the final work scope Deal with Customer technical visits to Avenza LM Service Shop Support Gate 3 team on any technical issue that might rise during engine re-assembly Support
Read the full description at gevernova.wd5.myworkdayjobs.com. FewerJobs shows a preview and links to the original posting.
Apply link verified; last checked Nov 20, 2026.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
Principal Engineer
GE Vernova - Houston
Aero Gas Turbine Maintenance Engineer
Chevron Corporation - Houston, Texas, United States of America
Midstream Compressor (Turbine) Technician I/II/III/Sr/Lead
EQT Corporation - Waynesburg, PA/Clarksburg, WV
Lead Technician
Clearway Energy (Class A) - Berlin, Pennsylvania, United States