FewerJobs.
All jobs

Material Planning Specialist (Temporary Position – 1 Year, with Potential for Extension)

GE HealthCare - Haifa

Posted Oct 29, 2026

Benefits

Parental leave
Not verified
Non-birth-parent leave
Not verified
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not offered From the posting source checked Nov 17, 2026
Childcare support
Not verified
Learning budget
Not verified
Verification
Not verified checked Nov 20, 2026
Salary
Not verified
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Role

Seniority
Mid From the posting source checked Nov 17, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Company

Equity
Offered Verified - SEC 10-K source checked Nov 17, 2026

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Material Planning Specialist (Temporary Position – 1 Year, with Potential for Extension) Haifa Job Description Summary The Material Planner is responsible for coordinating and expediting the flow of materials from suppliers and across internal departments to support production schedules. The role includes planning and scheduling material requirements, ensuring material availability, maintaining inventory accuracy, and supporting operational excellence initiatives. This position requires strong analytical skills, cross-functional collaboration, and the ability to contribute to continuous improvement projects. *This is a temporary position for one year, with the potential for extension based on business needs. Job Description Material Planning Specialist A multi-faced position combining demand planning, material change management, and master scheduling responsibilities, working closely with global headquarters and cross-functional teams. Key Areas of Responsibility: Master Scheduler Manage and deploy production forecasts from global headquarters Break down quarterly forecasts to weekly level based on production capacity Maintain forecast data in ERP system Create planning baseline for procurement and logistics Materials Change Coordinator Lead supply chain activities for Engineering Change Orders (ECO) Coordinate Phase In/Phase Out activities to mitigate obsolescence Manage product lifecycle including part creation and structuring Interface with Manufacturing, Engineering, Marketing, and Service teams MRP Infrastructure Maintenance Maintain and update Bills of Materials (BOMs) Ensure accuracy of MRP system settings and structures Support system integrity for production planning Required Qualifications: 2+ years experience in Materials Replenishment Planning (MRP) Advanced proficiency in Oracle ERP and Microsoft Excel (VBA advantage) Proven experience in Change Management (ECO/ECR/ECN) Experience in forecasting and production planning Strong analytical

Read the full description at gehc.wd5.myworkdayjobs.com. FewerJobs shows a preview and links to the original posting.

Apply at gehc.wd5.myworkdayjobs.com

Apply link verified; last checked Nov 20, 2026.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs