Data Center Construction Site Manager IV
Fluor Corporation - Houston, US-TX, United States
Posted Sep 25, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Offered From the posting source checked Nov 16, 2026
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified checked Nov 20, 2026
- Salary
- $166K-$310K From the posting source checked Nov 16, 2026
- 401(k) match
- Reported from DOL Form 5500 industry filing (not employer-specific)
Was this benefit information wrong? Tell us.
Market context
- U.S. role benchmark (BLS OEWS)
- $61,842 U.S. median for this role
- Projected growth (BLS Employment Projections)
- +1.9% - Slower
285% above the BLS role benchmark for operations aggregate.
Posted salary is far from this role benchmark; treat it as low confidence.
Matched to SOC 11-1021 - Operations aggregate by role bucket.
Source:U.S. Bureau of Labor Statistics, OEWS, May 2024andEmployment Projections, 2024-2034.
Role
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Company
- Equity
- Offered Verified - SEC 10-K source checked Nov 16, 2026
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Data Center Construction Site Manager IV Houston, US-TX, United States At Fluor, we are proud to design and build projects and careers. We are committed to fostering a welcoming and collaborative work environment that encourages big-picture thinking, brings out the best in our employees, and helps us develop innovative solutions that contribute to building a better world together. If this sounds like a culture you would like to work in, you're invited to apply for this role. Job Description The purpose of this position is to manage a medium- to large-sized construction-only project, engineering, procurement, fabrication, and construction (EPFC) project, a large and/or strategic maintenance or evergreen project, large turnaround/outage, or complex fabrication effort; to oversee and direct the performance of all construction and related activities in conformance with contract, plans, specifications, schedules, and cost estimates. This position requires authoritative knowledge and background for the project type/magnitude/complexity, holistic grasp of complex situations with the ability to move between intuitive and analytical approaches with ease, and see the overall picture and alternative approaches. With command, this role directs all staff in all functions necessary in their roles to meet or exceed all project objectives. This position will typically be the lead person directing all construction activity for a project (s) including the office(s) and project site(s); commonly serving as the Site Manager - the lead staff position responsible for and directing all activities at the site. • Manage the execution of assigned project(s) in conformance with the requirements of the prime
Read the full description at careers.fluor.com. FewerJobs shows a preview and links to the original posting.
Apply link verified; last checked Nov 20, 2026.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
Construction Site Manager IV - Data Center EPC
Fluor Corporation - Hawesville, US-KY, United States
Data Center Construction Project Manager
Jane Street Group, LLC - New York, New York, United States
Construction Manager - Large Data Center Projects + Thermal + AC Power
Vertiv - Abilene, TX, United States
Development Project Manager (Retrofit Data Center Construction)
QTS Data Centers - Irving, Texas, United States of America