FewerJobs.
All jobs

Field Specialist III - SVS - CTRL

Baker Hughes - MY-KUL-KUALA LUMPUR-21ST FLOOR MENARA TAN & TAN

Posted Nov 19, 2026

Benefits

Parental leave
12 weeks From the posting source
Non-birth-parent leave
8 weeks From the posting source
Family-building benefits
  • Fertility benefits: Not verified
  • Adoption assistance: Not verified
  • Surrogacy assistance: Not verified
Mental health support
Not verified
Relocation assistance
Not verified
Childcare support
Not verified
Learning budget
Not verified
Verification
Source-linked checked May 7, 2026
Salary
Not verified
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Role

Seniority
Mid From the posting source

Schedule

Shift type
Not verified
Weekend work
Not verified

Company

Equity
Offered Verified - SEC 10-K source

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Field Specialist III - SVS - CTRL MY-KUL-KUALA LUMPUR-21ST FLOOR MENARA TAN & TAN Job Description Role Summary Reporting to the Resource Manager and operationally to the Site Managers, the Heavy-Duty Gas Turbine Mechanical Specialist is responsible for the technical decisions necessary to carry out the erection, pre-commissioning, commissioning and start-up phases of the project. He/ She shall be able to perform the below tasks in autonomy: Unloading and Inspection of the gas turbine major auxiliaries at the installation site and their placement on the foundation Geometric dimensional check of foundation, equipment and auxiliary's skids positioning, levelling (ensure levelness and elevations of subsole plates and perform contact checks between subsole plates and package supports) and alignment Knowledge of IDM (Installation Design Manual GEAE) for all different Gas Generators, such as LM2500 SAC, DLE, Plus, LM6000 SACPB, LM6000 DLEPB, HSPT Advise on interpretation of GE drawings for installation optimisation Gas Generator assembly and disassembly activities Installation and assembling activities of gas turbine and auxiliary equipment such as oil console, air system, interconnection piping, coolers, structure, ducts, oil flushing, blowing, etc Clearances check, especially on power turbine PGT25 Perform lube oil and cooling water systems flushes as per GE recommended procedures Install inlet and exhaust systems per GE / Vendor specifications Pre-commissioning and commissioning of oil system, starting system, fuel gas system, air system Ensure all gas piping and orifices are correctly installed for each piping system Mark-up all piping drawings to show piping modifications Piping & Instruments (P&I) Marked-up Ensure packages/rotors

Read the full description at bakerhughes.wd5.myworkdayjobs.com. FewerJobs shows a preview and links to the original posting.

Apply at bakerhughes.wd5.myworkdayjobs.com

Apply link verified; last checked Nov 20, 2026.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs