Estimator - Data Center Construction
Atkore Inc - Atkore - Unistrut Construction
Posted Jun 12, 2026
Benefits
- Parental leave
- Not verified
- Non-birth-parent leave
- Not verified
- Family-building benefits
-
- Fertility benefits: Not verified
- Adoption assistance: Not verified
- Surrogacy assistance: Not verified
- Mental health support
- Not verified
- Relocation assistance
- Not verified
- Childcare support
- Not verified
- Learning budget
- Not verified
- Verification
- Not verified
- Salary
- Not verified
Was this benefit information wrong? Tell us.
Market context
- U.S. role benchmark (BLS OEWS)
- $61,842 U.S. median for this role
- Projected growth (BLS Employment Projections)
- +1.9% - Slower
Matched to SOC 11-1021 - Operations aggregate by role bucket.
Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.
Role
Schedule
- Shift type
- Not verified
- Weekend work
- Not verified
Company
- Equity
- Offered Verified - SEC 10-K source checked Jun 20, 2026
Application
- Cover letter
- Not verified
- Assessment
- Not verified
- Deadline
- Not stated
Where they hire
State eligibility is not yet verified.
About this role
Estimator - Data Center Construction Atkore - Unistrut Construction Atkore, a recipient of a Great Place to Work© certification and a Top Workplaces USA award, is searching for a Construction Estimator to be based out of Addison location. Reporting to the Senior Manager, Estimating, this person will be responsible for collaborating with sales, project management and drafting to produce estimates and quotes from prints and design specifications. This role is ideally suited for estimators with experience supporting hyperscale data centers, major healthcare campuses, and other coordination-intensive construction environments where fabrication integration, schedule certainty, and execution-ready pricing are critical to project success.
Read the full description at recruiting2.ultipro.com. FewerJobs shows a preview and links to the original posting.
Apply link not verified; last-live date unavailable.
What verified means
Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.
Related jobs
-
Warehouse Teammate- Equipment Operator
Accendra Health INC - Greensburg, PA
-
DATA CENTER ENGINEER
Digital Realty - Location not specified
-
WW Assembler Operator
Vishay Precision Group INC - Columbus, NE
-
SETA 2, Project Analyst in AI/ML
ICF International INC - Alexandria, VA