System Admin, Data Center Construction Tooling, Data Center Capacity Delivery
Amazon - Seattle, Washington, USA
Posted 5/6/2026
Verified benefits
- Parental leave
- 6 weeks source
- Non-birth-parent leave
- 6 weeks
- Verified
- Yes last checked 2023
- Salary
- $80K - $111K USD
Where they hire
State eligibility is not yet verified.
About this role
System Admin, Data Center Construction Tooling, Data Center Capacity Delivery Seattle, Washington, USA AWS Data Center Capacity Delivery (DCCD) is looking for a Systems Administrator to develop and own a
Read the full description at www.amazon.jobs. FewerJobs shows a short excerpt and links to the source.
Related jobs
-
Maintenance Engineer
Tetra Pak - Location not specified
-
Maintenance Engineer - Processing
Tetra Pak - Location not specified
-
Quality Engineer
Tetra Pak - Location not specified
-
Service Engineer (Tours, Orléans, Bourges)
Tetra Pak - Location not specified