FewerJobs.
All jobs

Pre-Construction Manager, AMER West Data Center Construction

Amazon - Dallas, Texas, USA

Posted Jun 11, 2026

Benefits

Parental leave
6 weeks From the posting source checked Jun 20, 2026
Non-birth-parent leave
6 weeks From the posting source checked Jun 20, 2026
Family-building benefits
  • Fertility benefits: Offered From the posting source checked Jun 20, 2026
  • Adoption assistance: Offered From the posting source checked Jun 20, 2026
  • Surrogacy assistance: Not verified
Mental health support
Offered From the posting source checked Jun 20, 2026
Relocation assistance
Not verified
Childcare support
Offered From the posting source checked Jun 20, 2026
Learning budget
Not verified
Verification
Source-linked checked Jun 7, 2026
Salary
$111K-$186K From the posting source checked Jun 20, 2026
401(k) match
Reported from DOL Form 5500 industry filing (not employer-specific)

Was this benefit information wrong? Tell us.

Market context

U.S. role benchmark (BLS OEWS)
$111,944 U.S. median for this role
Projected growth (BLS Employment Projections)
+13.7% - Much faster than average

33% above the BLS role benchmark for data and ml aggregate.

Matched to SOC 15-1252 - Data and ML aggregate by role bucket.

Source: U.S. Bureau of Labor Statistics, OEWS, May 2024 and Employment Projections, 2024-2034.

Role

Role function
Data From the posting source checked Jun 20, 2026
Seniority
Mid From the posting source checked Jun 20, 2026

Schedule

Shift type
Not verified
Weekend work
Not verified

Company

Company stage
Public-company From the posting source checked Jun 20, 2026
Equity
Offered Verified - SEC 10-K source checked Jun 20, 2026

Application

Cover letter
Not verified
Assessment
Not verified
Deadline
Not stated

Where they hire

State eligibility is not yet verified.

About this role

Pre-Construction Manager, AMER West Data Center Construction Dallas, Texas, USA Amazon's Data Centers are industry leading examples of innovation in design, efficiency, and cost effectiveness. As Pre-Construction managers, we are the nationwide team responsible for planning the construction of the Amazon's new sites. We are on the forefront of creating and delivering the most innovative products to our customers; and are known for innovating the possibilities of cloud computing. As a Pre-Construction Manager you will support the development and implementation of a Pre-Construction program execution across the nation over multitude of campuses. This role will serve as the primary liaison between Real Estate, Design Engineering, Due Diligence, and other critical partner teams from initial planning, through design development to provide schedule forecasting, construction budgeting, and constructability guidance. Our goal is to find the candidate with extensive practical construction experience with bidding, contracting, construction documents, industry infrastructure, design, and engineering. Key job responsibilities • Foundational knowledge of critical data center equipment (Generators, Uninterruptible Power Supplies, Switchgear, Transformers, Power Feeders & Busduct, Chillers, Plumbing, Fire Detection/Suppression, Air Handling Units, Computer Room Air Handling/Conditioning Units). • Perform constructability reviews of critical scopes associated with the construction of new data centers building and sites and drive improvements in baseline. • Perform build phasing evaluations in terms of civil, structural, electrical fields for potential sites. • Determine and communicate site requirements that could impact schedule, cost, delivery of the work and integration of site with surrounding properties. • Conduct negotiations with land sellers, developers, general

Read the full description at www.amazon.jobs. FewerJobs shows a preview and links to the original posting.

Apply at amazon.jobs

Apply link not verified; last-live date unavailable.

What verified means

Verified means a displayed claim has field-level provenance to a source FewerJobs pulled: a government or employer source, or the original job posting. Posting-sourced facts are employer-stated and are labeled separately from government records.

Related jobs