Manager of Construction, Virginia Data Center Construction
Amazon - Herndon, Virginia, USA
Posted 5/5/2026
Verified benefits
- Parental leave
- 6 weeks source
- Non-birth-parent leave
- 6 weeks
- Verified
- Yes last checked 2023
- Salary
- $153K - $255K USD
Where they hire
State eligibility is not yet verified.
About this role
Manager of Construction, Virginia Data Center Construction Herndon, Virginia, USA The Manager of Construction is a strategically significant role on the Data Center Construction team dedicated to leading, mentoring, and
Read the full description at www.amazon.jobs. FewerJobs shows a short excerpt and links to the source.
Related jobs
-
Maintenance Engineer
Tetra Pak - Location not specified
-
Maintenance Engineer - Processing
Tetra Pak - Location not specified
-
Quality Engineer
Tetra Pak - Location not specified
-
Service Engineer (Tours, Orléans, Bourges)
Tetra Pak - Location not specified